GREEN TIP OF THE WEEK

Insulate your hot water heater (a tank that is warm to the touch needs added insulation), as well as hot water pipes and ducts located in unheated areas.

E-Newsletter & Interest Notification Sign-Up

FOLLOW US ON

DIRECTIONS TO SBESC

Translate This Page

Rain Barrel Distribution - Culver City

Date: 
Saturday, January 20, 2018
Time: 
8:00 A.M. - 12:00 P.M.

Registrations are CLOSED (10:00 A.M., 1/19/18).

Eligibility & Guidelines:

Participants in the rain barrel distribution program must meet the following requirements and follow all guidelines below:

  • Must be a resident in West Basin’s service area.
  • Limit two (2) rain barrels per household, while supplies last. This may be reduced, based upon demand.
  • Rain Barrel must be installed within 30 days, and may be subject to verification and inspection by West Basin and or the Metropolitan Water District of Southern California.
  • Recipients must email photo(s) of installed rain barrel(s) within 30 days of receiving barrel(s). Email: JeremiahS@westbasin.org.
  • The rain barrel must be mounted in a way that allows it to receive water unimpeded from a rain gutter.
  • Should not block or restrict access to walkways or pathways.
  • Should be elevated six (6) inches off the ground with a cinder block or another solid foundation.
  • Should be secured in place with straps for safety.
  • Home must be equipped with rain gutters and downspout(s).

AttachmentSize
PDF icon 12-13-17 Rain Barrel Dates Flyer.pdf546.75 KB
Location: 
West Los Angeles College - 9000 Overland Ave., Culver City, CA 90230